dcsimg
Self Help Forums

Go Back   Self Help Forums > Repair > Building Construction - Existing Home
Register FAQ Members List Calendar Today's Posts

Building Construction - Existing Home Building Construction Repair / Remodeling Ideas and Problem Solving Solutions

Reply
 
Thread Tools Display Modes
  #1   IP: 206.47.135.66
Old October 13th, 2004, 07:45 AM
Mr Fixit eh's Avatar
Mr Fixit eh Mr Fixit eh is offline
Super Moderator

 
Join Date: Feb 2004
Location: Ontario, Canada
Posts: 476
Default Cement Board Screw Spacing

I'm making a ceramic tile countertop for the kitchen. I'm using 3/4" pressure treated plywood with 1/2" cement board applied overtop, with a skim coat of thinset between the plywood and cement board. I'm wondering about spacing of the cement board screws...I've read that 8" spacing is recommended, but at the price of the cement board screws, this seems like alot.

What about backsplash tiles...do I need to apply cement board first, or can I apply the tile directly to the existing painted dry drywall. If cement board is recommended, do I use the same spacing?

Why are special cement board screws required? Why can't you just use drywall screws?
__________________
"If you think education is expensive - try ignorance." (Bok's law)

Steve
Reply With Quote
  #2   IP: 148.78.243.122
Old October 13th, 2004, 04:15 PM
Wgoodrich's Avatar
Wgoodrich Wgoodrich is offline
Super Moderator

 
Join Date: Sep 2002
Posts: 7,451
Default

The Code requires you to install per the manufacturer's installation instructions. If you vary from those rules your inspector can reject the inspection. If you have no inspection such as the type job you are talking of just building a counter top not affecting the integrity of the structure then if you vary from the material they call for and secure as they suggest it is buyer beware.

Remember if you have a gap between the plywood and the cement board that cement board will break as you tighten down the mounting screws. Also remember if you gap out too much with the mounting screws you invite movement then breaking of the cement board then cracking of the tiles layed as the finished surface.

There are many methods of laying tile. Blue board where in wet location [moisture resistant drywall] or cement board or many other products. You have a method going why not stay with the same design on the back splash as the counter top?

Hope this helps

Wg
Reply With Quote
Reply






Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Trane XE90 Ignition Circuit Board Blown Quazar Heating & Air Conditioning - Existing Home 1 October 17th, 2011 07:28 AM
Use of green board on shower walls Kray Building Construction - Existing Home 8 December 22nd, 2008 08:10 AM
cement backer board Bob H Plumbing - Existing Home 3 June 30th, 2004 05:25 PM
5/8 particle board screw schedule mdshunk Building Construction - Existing Home 1 February 11th, 2004 04:06 PM
Notching Joists sszakats Electrical - Existing Home 1 December 18th, 2002 01:14 PM


All times are GMT -4. The time now is 08:10 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
© 2002 - QuinStreet, Inc.
http://www.selfhelpforums.com