I am in the middle of upgrading the electrical service in my house (which I just bought) from 60 amps to 200 amps. I have the meterbase and panel box up and it passed inspection and is ready to be connected. After the power company switches the electric over to my new box can I take my old entrance cable and run it from my new panel box on a 60 amp circuit breaker to power my old fuse box until I have time to rewire different protions of the house?
Also what are the calculations I need to do to figure the size circuit breakers I need in my new circuits when I start to rewire.
Posted: Mon Aug 19, 2002 10:48 am
I am in the middle of upgrading the electrical service in my house (which I just bought) from 60 amps to 200 amps. I have the meterbase and panel box up and it passed inspection and is ready to be connected. After the power company switches the electric over to my new box can I take my old entrance cable and run it from my new panel box on a 60 amp circuit breaker to power my old fuse box until I have time to rewire different protions of the house?
Also what are the calculations I need to do to figure the size circuit breakers I need in my new circuits when I start to rewire.