PDA

View Full Version : 200 amp Service Panel to Meter


65mustang
May 24th, 2007, 06:37 PM
On a new install what is the best way to feed a 200 amp load center panel from the meter? Looking at parallel runs of #3, vs one run of 3 o. Both in 2" PVC, about a 25' run.
Appreciate your experience, single run does not look like fun and big$$. This is in ON.
Thanks

joed
May 25th, 2007, 05:46 AM
You are not permitted by code to parallel cunductors under 1/0 in size.