November 3rd, 2006, 08:12 PM
I want to put in a celing in my pole building but I am not sure if the trusses will be able to support any kind of ceiling (Drywall or Metal) or would I have to add supports or something. Here is the building specs and truss specs. I do not know how much info you need.
Building: 30Wx42Lx14H Wood Frame & Metal Roof and Sides
Trusses: Standard Web Design 30' Trusses w/1' over hang. 4ft oc spacing
Loading (psf): Spacing: 4-0-0
TCLL 40.3 Plates Increase 1.15
TCDL 7.0 Lumber Increse 1.15
BCLL 0.0 Rep Stress Incr NO
BCDL 1.0 Code IRC2003/TPI2002
Lumber Bracing
TC:2x6 SYP 2400F 2.0E TC:2-0-0 oc purlins (2-2-14 max)
BC:2x4 DFSYP 2400F 2.0E (Switched from sheeted: Spacing 2-0-0)
W:2x4 SPF Stud *Excep* BC:Rigid ceiling directly applied or 8-6-8 oc bracing
4-10 2x4 SPF No.2, Joints: 1 Brace at Jt(s): 4
4-8 4x4 SPF No.
I hope this all the info you need yo help. I am not an engineer so I do not understand all the junk they post on the truss paper.
Thanks
Howie
Building: 30Wx42Lx14H Wood Frame & Metal Roof and Sides
Trusses: Standard Web Design 30' Trusses w/1' over hang. 4ft oc spacing
Loading (psf): Spacing: 4-0-0
TCLL 40.3 Plates Increase 1.15
TCDL 7.0 Lumber Increse 1.15
BCLL 0.0 Rep Stress Incr NO
BCDL 1.0 Code IRC2003/TPI2002
Lumber Bracing
TC:2x6 SYP 2400F 2.0E TC:2-0-0 oc purlins (2-2-14 max)
BC:2x4 DFSYP 2400F 2.0E (Switched from sheeted: Spacing 2-0-0)
W:2x4 SPF Stud *Excep* BC:Rigid ceiling directly applied or 8-6-8 oc bracing
4-10 2x4 SPF No.2, Joints: 1 Brace at Jt(s): 4
4-8 4x4 SPF No.
I hope this all the info you need yo help. I am not an engineer so I do not understand all the junk they post on the truss paper.
Thanks
Howie